By Tony Bellisario, VP of Infrastructure Advisory Services, 7 Layer Solutions
Post-merger IT integration goes fastest when every add-on acquisition is measured against the same baseline IT standard. Without one, each deal brings a new email system, network, security stack and support vendor, and the platform company ends up running several IT environments instead of one.
In a buy-and-build strategy, that complexity compounds with every add-on. Security gaps multiply, support costs rise and the value creation plan slows down. This playbook lays out the approach 7 Layer Solutions uses with private equity firms and their portfolio companies: define the baseline, assess each add-on against it before close, and integrate it onboard it onto shared support and security in about five weeks, then finish the integration through follow-on projects.
The baseline IT standard is the target every add-on will be brought up to. It's set once, at the platform company, with the executive team weighing cost, risk and efficiency. It covers four areas:
|
Area |
What the baseline defines |
Why it matters for buy-and-build |
|---|---|---|
|
Network and internet |
Standard firewalls with intrusion detection and prevention (IDS/IPS), switches and centrally authenticated Wi-Fi, managed from a single portal; internet of at least 500 Mbps with redundancy from a second provider or cellular backup; UPS on all network gear |
One way to manage, patch and monitor every location |
|
Devices and business apps |
Standard PC builds; centralized identity and sign-in; mobile device management; remote monitoring and management on every device; standard productivity, file sharing, ERP and CRM apps; clean onboarding and offboarding |
New employees are productive on day one, and departing employees lose access immediately |
|
Cybersecurity |
EDR on every Windows and Mac device; a managed 24/7 SOC backed by 7 Layer incident responders; email security; Microsoft 365 backup; daily backup and disaster recovery; disk encryption, MFA and password policies; monthly patching and phishing campaigns; all aligned to the NIST framework |
One security posture across the portfolio, and one story for insurers and buyers at exit |
|
IT support |
One Level 1–3 help desk with one ticketing process and escalation path; remote support first, with planned on-site visits and laptop staging and shipping for new hires |
The platform operates as a single company and fixes root causes once |
A clear baseline turns every future acquisition into a gap analysis instead of a fresh IT project.
Pre-close IT diligence tells the deal team how far an add-on is from the baseline and what it will cost to close the gap. A focused IT health check typically takes three to four weeks and combines interviews with the target's leadership and IT staff with a review of its documentation.
For buy-and-build, the assessment should answer three questions:
The findings should be reviewed with the platform's executive team before close, so the integration plan is agreed before Day 1. For the full list of what to review, see our IT due diligence checklist for private equity acquisitions.
A standard onboarding takes about five weeks from kickoff to steady state. It runs as a formal project with defined workstreams, owners and sign-off gates. Week 1 begins at kickoff after contract signature, and the add-on's existing IT provider or parent-company IT stays the primary support until the Day 1 cutover.
|
Workstream |
Weeks |
What happens |
|---|---|---|
|
Initiation and project setup |
Week 1 |
Kickoff with the acquired company and deal sponsor; project manager and technical leads assigned; in-scope services confirmed; weekly status call set |
|
Discovery and access readiness |
Weeks 1–2 |
Secure credential handoff; admin accounts created in core systems; device, user, license and vendor inventory; existing IT provider engaged |
|
Remote monitoring and management |
Weeks 2–3 |
Monitoring agent piloted on a few devices, then deployed broadly and checked against the asset list until 95% of devices are reporting |
|
Documentation and knowledge transfer |
Weeks 2–4 |
Network, servers, cloud tenants, backup, email and DNS, domains, certificates, SaaS owners and vendor contacts documented |
|
Security enablement |
Weeks 3–4 |
Legacy endpoint protection replaced with EDR (detect-only first, then protect), 24/7 SOC monitoring, plus email and SaaS security as scoped |
|
Service and support readiness |
Weeks 3–4 |
Ticket queues and support email routing; onboarding and offboarding process; welcome email and staff FAQ |
|
Support cutover |
Weeks 4–5 |
Go/no-go decision, then Day 1: the new provider takes tickets and alerts, open tickets transfer, admin access and MFA are reassigned and legacy access is removed |
|
Acceptance and steady state |
Week 5 |
Patching enabled, operating processes confirmed, client sign-off, open items moved to a phase 2 roadmap |
Each workstream closes with a sign-off, and support only moves after a go/no-go decision:
Planning an add-on or roll-up? See how 7 Layer supports private equity firms from diligence through integration on our IT services for private equity page.
Most schedule risk sits outside the IT provider's direct control, so early engagement from the add-on matters. Before kickoff, line up:
Five weeks is a dependable baseline for a standard onboarding. These factors most often extend it:
The five-week onboarding puts the add-on on the platform's help desk, monitoring and security. Deeper integration follows as separate, scoped projects:
Moving the add-on's email, files and Teams into the platform's Microsoft 365 tenant is usually the most visible follow-on project. Plan it carefully:
Use this checklist for every acquisition in a buy-and-build strategy.
Before close
Week 1
Weeks 2–3
Weeks 3–4
Weeks 4–5: cutover
Week 5: steady state
After onboarding: follow-on projects
These issues show up in diligence and integration work again and again, even at well-run companies:
Operating partners need a simple view of integration progress across the portfolio. 7 Layer provides quarterly cybersecurity status reports that rate each service, from patching and backups to EDR, SOC monitoring and phishing campaigns, as no issues, minor issue or major issue, with critical alerts handled immediately by the SOC and incident response team. During integration, a monthly report for each add-on should cover:
7 Layer Solutions is a Schaumburg, Illinois-based managed IT, cybersecurity and advisory firm with a primary focus on private equity firms and their portfolio companies, and a member of the advisory board of The Private Equity CFO Group. Across the deal lifecycle, 7 Layer provides:
With 12+ years in business, 7 Layer employs 75+ full-time, U.S.-based engineers and doesn't subcontract or white-label its managed IT services, so the team that assesses an add-on is the team that supports it after close. 95% of support requests are resolved remotely by the Level 1–3 help desk, and 7 Layer's Illinois depot inventories, configures and ships laptops so new and remote employees are ready on day one.
Talk to 7 Layer's Infrastructure Advisory Services team about setting a baseline IT standard or assessing your next acquisition. Talk to our team →
Keep reading